top of page

Vacaville Electric Bus Charging Station

Structural Steel

Vacaville, CA

Construction of a new electric bus charging facility for the City of Vacaville transit fleet, including charging infrastructure canopies, structural steel support systems, bollards, and associated site improvements to support the transition to electric bus operations.


NMI Provided:

  • Fabrication and erection of 153 tons of galvanized structural steel for the electric bus charging station canopies.

  • Fabrication and supply of 194 galvanized bollards.

  • Structural embeds associated with the steel package.

© 2026 by NMI Industrial Holdings, LLC. TM

bottom of page