top of page

SJWD Filter Backwash Hood Rehabilitation

General Contractor • Miscellaneous Metals • Electrical Systems • Coatings • Process Piping

Granite Bay, CA

A two-season infrastructure rehabilitation at SJWD’s water treatment plant, upgrading mechanical systems, structural steel, and protective coatings across dual filter basins to enhance reliability and water quality compliance.



  • Removal, refurbishment, and reinstallation of backwash bridges, pump houses, and trough hoods

  • Replacement of drive systems, backwash/surface wash piping, and hydraulic controls

  • NSF 61-compliant sandblasting and recoating of all wetted steel surfaces, including injectors and rail assemblies

© 2026 by NMI Industrial Holdings, LLC. TM

bottom of page