top of page

Biosolids Digester Waste Conveyor Installation

Conveyor Construction • Industrial Platforms

San Francisco, CA

Installation of a biosolids conveyor system within Building 615 at the Southeast Water Pollution Control Plant as part of the Biosolids Digester Facilities Program, supporting automated transfer and truck loadout of processed biosolids within the treatment facility.



  • Mechanical installation of biosolids conveyor equipment including transfer conveyors, crossover conveyors, and truck loadout conveyors.

  • Installation of stainless steel slide gates, silo bypass chutes, and associated conveyor support steel integrated with the facility structure.

  • Received, rigged, and assembled of conveyor equipment within the facility, including all field welding and integration with manufacturer-supplied systems.

© 2026 by NMI Industrial Holdings, LLC. TM

bottom of page